Skip to content
TR+90 252 559 0 112
Get a quote
Home/Articles

Articles

Notes from the field on concrete, pouring and site practice.

Concrete Cracks: Types, Causes and Ways to Prevent Them
Technical

Concrete Cracks: Types, Causes and Ways to Prevent Them

Recognise the five types of crack, from plastic shrinkage to structural, by their timing and direction; which are cosmetic, which are dangerous, how they are prevented and how they are repaired.

Read the article
Concrete Consistency Classes: The Slump Test, S1-S5 and Pump Concrete
Technical

Concrete Consistency Classes: The Slump Test, S1-S5 and Pump Concrete

What the concrete consistency classes S1 to S5 mean, how the slump test is carried out, which consistency to choose for which element, and why pump concrete is designed differently.

Read the article
Pouring Concrete in Winter: Cold-Weather Precautions and Freezing Risk
Site

Pouring Concrete in Winter: Cold-Weather Precautions and Freezing Risk

Cold weather slows hydration and exposes fresh concrete to freezing. Precautions on the mix and site sides, formwork striking time and warnings specific to the Bodrum winter.

Read the article
Water/Cement Ratio: Why Does Excess Water Weaken Concrete?
Technical

Water/Cement Ratio: Why Does Excess Water Weaken Concrete?

Every extra litre of water added to concrete leaves capillary voids behind after hardening. The effect of the water/cement ratio on strength, impermeability and service life.

Read the article
How to Order Concrete: m³ Calculation, Pump Selection and Pour Day
Ordering

How to Order Concrete: m³ Calculation, Pump Selection and Pour Day

m³ calculation, class and consistency selection, pump type, access check and pour-day planning when ordering ready-mix concrete — a practical guide from the Bodrum and Milas field.

Read the article
What Is Concrete Curing? A Guide to Hot-Weather Pouring and Curing
Practice

What Is Concrete Curing? A Guide to Hot-Weather Pouring and Curing

Why is concrete cured and for how many days? Plastic shrinkage cracks in hot, windy weather, curing methods and a site checklist.

Read the article

Need concrete for your project?

Contact our sales team for mix design, delivery planning and a price quote. Fast delivery from our Milas / Muğla plants to the Bodrum, Milas, Ören and Güllük line.